• Home
  • Products
  • Case study
  • Blog
  • Contact

Case study

Zero Downtime Samba 3 to 4 Migration for a Banking System
Case study

Zero Downtime Samba 3 to 4 Migration for a Banking System

Introduction Legacy systems often persist in critical environments like banking, but upgrading them requires surgical precision. Here’s how we migrated a Samba 3 file server to Samba 4 – without downtime – in a high-risk, production banking system. The Challenge The bank relied on a Samba 3 server with outdated security protocols, storing highly Read more…

By razvan, 2 weeks ago
Cutting Costs and Regaining Control – Migrating from VMware to Proxmox VE
Case study

Cutting Costs and Regaining Control – Migrating from VMware to Proxmox VE

Introduction Many IT teams today face rising licensing costs and vendor lock-in, especially with proprietary solutions like VMware. This case study shows how one organization transitioned to Proxmox VE, achieving full infrastructure control and over 50% cost savings. The Challenge The client operated a medium-sized virtualization infrastructure based on VMware vSphere. Read more…

By razvan, 2 weeks ago

Posts pagination

Previous 1 2
  • Home
  • Products
  • Case study
  • Blog
  • Contact
Hestia | Developed by ThemeIsle
This website uses cookies to improve your experience. We'll assume you accept this policy as long as you are using this websiteAcceptView Policy